Waihi Gold Project

Waihi Gold Project Design, in New Zealand, Australia, included mechanical and control engineering for a 2.0 km conveyor at 700 tph.

Year Built: 1989
Location: New Zealand, Australia
Conveyor Length: 2.0 km
Power:
Tonnage: 700 tph
Belt Strength: 
Belt Speed: 
Material Conveyed:

 

Waihi Gold Project was last modified: May 5th, 2016 by CDI