Samarco Project

samarco3_large samarco2_large samarco_large

Samarco Project Design services for both projects include mechanical design, dynamics analysis, brake system design, instrumentation, and control system design. The control system design included the logic development, programming (Allen Bradley SLC503/SLC504), supervisory system (Wonderware Intouch) development and programming, on-site commissioning, and performance testing.

The project Alegria 6 is a 2.6 Km route at 3300 TPH for the transportation of iron ore consisting of three downhill conveyors, one that is mobile. Alegria 9 is a 1.9 Km route at 3785 TPH for the transportation of iron ore consisting of three downhill conveyors, one that is mobile.
Year Built: 1995 / 1998
Location: Alegria 6/9, Samarco, Brazil
Conveyor Length: (Alegria 6) 2.6 km / (Alegria 9) 1.9 km
Power: (Alegria 6) 2,000 kW / (Alegria 9) 2,150 kW
Tonnage: (Alegria 6) 3,300 tph / (Alegria 9) 3,785 tph
Belt Strength:  (Alegria 6) ST-1800 N/mm / (Alegria 9) ST-2600 N/mm
Belt Speed:  (Alegria 6) 3.9 m/s / (Alegria 9) 4.4 m/s
Material Conveyed: Iron Ore

 

Samarco Project was last modified: May 5th, 2016 by CDI