Phosboucraa Project

phos_large phos4_large phos3_color
 phos2_large

Phosboucraa Project Analysis – The system had been out of commission for a number of years and was experiencing numerous problems. CDI was contracted to audit the system and identify problems using audit techniques and forensic analysis.

Year Built: 1996
Location: Morocco, Africa
Conveyor Length: 96.0 km
Power: 24,000 kW
Tonnage: 1,800 tph
Belt Strength:  ST-3150 N/mm
Belt Speed:  4.0 m/s
Material Conveyed:
Interesting features:
The system had been out of commission for a number of years and was experiencing numerous problems. CDI was contracted to audit the system and identify problems.

 

Phosboucraa Project was last modified: May 5th, 2016 by CDI