New Millennium Iron Feasibility Project

New Millennium Iron Feasibility Project Study included design engineering and consultancy work on the New Millennium Iron Mine dry tailing stacking operation system Feasibility Study with OPEX/CAPEX cost estimates.

Year: 2015
Location: Canada
System: 2 Stackers, 17 Conveyors, Electrical Distribution, and Controls
Capacity:  9,250 tph
Material Conveyed: Iron Ore Tailings

 