Neptune Terminals Project

Photograph of a Pipe Conveyor installed on Neptune Terminals project. Photograph of a Pipe Conveyor installed on Neptune Terminals project.

Neptune Terminals Project Design included mechanical design of a 160 m pipe conveyor. Additional Forensic work in 2015.

Year Built: 2011
Location: Neptune Terminals – Vancouver, BC, Canada
Conveyor Length: 160 m
Power: 372 kW
Tonnage: 3,500 tph
Belt Strength:  EP-800 N/mm
Belt Speed:  4.3 m/s
Material Conveyed: Potash

 

Additional Work at Site

Projects on site after initial project completion
Year: Type: Scope Description
2015 Forensic Analysis Forensic analysis for high abrasive wear on the belt edge of the inner belt overlap.

 

Neptune Terminals Project was last modified: May 4th, 2016 by CDI