Nayong Project

Nayong Project Design included belt design and system review for a 7 km pipe.

Year Built: 2012
Location: Nayong, China
Conveyor Length: 7.0 km
Power: 2,700 kW
Tonnage: 900 tph
Belt Strength:  ST-2500 N/mm
Belt Speed:  3.15 m/s
Material Conveyed: Coal

 

Nayong Project was last modified: May 4th, 2016 by CDI