La Coipa Project

La Coipa Project Design services included mechanical design, dynamic analysis, brake system design, instrumentation, and control system design. The control system design included the logic development and programming (Modicon PLC 984), supervisory system (FactoryLink) development and programming, on-site commissioning, and performance testing.

Year Built: 1994
Location: La Coipa Project, Chile
Conveyor Length: 3.35 km
Power: 2,000 kW
Tonnage: 2,500 tph
Belt Strength:  ST-1800 N/mm
Belt Speed:  4.57 m/s
Material Conveyed: Gold Ore / Silver Ore
Interesting features:
–   The project is a 3.3 Km route at 2500 TPH consisting of one downhill and one uphill.

 

La Coipa Project was last modified: May 5th, 2016 by CDI