Kemess Aurico Feasibility Project

Kemess Aurico Feasibility Project Study included design engineering and consultancy work on the Kemess Aurico Mine underground feeder and overland conveyor with OPEX/CAPEX cost estimates. The original 2012 feasibility study was updated in 2015.

Year: 2012 / 2015
Location: Kemess, BC, Canada
System: Underground Feeder, Overland Conveyor, Electrical Distribution, and Controls
Capacity:  1,600 tph
Material Conveyed: Copper Ore

 