Collahuasi Project

Collahuasi_3 Collahuasi_1 Collahuasi_2
Collahuasi_4 Collahuasi_Chute

Collahuasi Project Design included mechanical design audit, chute designs (4 chutes) joint venture with Krupp, and provided control system logic. Additional Forensic work done on site in 2009 and 2011.

Year Built: 2003
Location: Collahuasi Project, Chile
Conveyor Length: 3.284 km
Power: 14,400 kW
Tonnage: 11,400 tph
Belt Strength:  ST-2550, ST-4400 N/mm
Belt Speed:  6.5 m/s
Material Conveyed: Copper Ore
Interesting features:
–   Downhill horizontal curves

 

Chute Design

Project scope included chute design and DEM analysis for four chutes, each with capacity up to 8,500 tph.
Number of Chutes: 4
Chute Design: Yes
ROCKY DEM Analysis: Yes
Capacity:  8,500 tph

 

Additional Work at Site

Projects on site after initial project completion
Year: Type: Scope Description
2009 Forensic Analysis Forensic testing to determine cause of VFD failures on Conveyor 203 at the Campania Minera Dona Ines de Collahuasi mine. The protection system did not function correctly, allowing severe electrical damage to all the VFD’s.
2011 Forensic Analysis Forensic testing to determine cause of belt failure on Conveyor 205 at the Campania Minera Dona Ines de Collahuasi mine.

 