BHP Bi-Way Project

BHP Bi-Way Project Conveyor

BHP Bi-Way Project – Services for this 8.5 km curved, overland system included feasibility, design audit, tunnels, and head tail drive.

Year Built: 1996
Location: Port Hedland, Australia
Conveyor Length: 8.5 km
Power: 2,700 kW
Tonnage: 4,000 tph
Belt Strength:  ST-2000 N/mm
Belt Speed:  6.2 m/s
Material Conveyed: Iron Ore

 

BHP Bi-Way Project was last modified: May 5th, 2016 by CDI