Asanko Feasibility Project

ELB РAsanko Feasibility Project Study included Design engineering and consultancy work on the Asanko Ghana Overland Conveyor (OLC) feasibility study with OPEX/CAPEX cost estimates.

Year: 2015
Location: Ghana
System: Overland Conveyor (26.0 km)
Capacity:  900 tph
Material Conveyed: Gold Ore

 

Asanko Feasibility Project was last modified: May 5th, 2016 by CDI