Aqaba Project

Aqaba_04 Aqaba_23 Aqaba_29
Aqaba_30 Aqaba_27 Aqaba_15

Aqaba Project services included mechanical redesign, full system control design, and commissioning with fully automated stacking and reclaiming equipment.

Year Built: 2009
Location: APC – Aqaba, Aqaba, Jordan
Conveyor Length: 559 m (Stacker) and 526 m (Reclaimer)
Power: 100 kW (Stacker) and 150 kW (Reclaimer)
Tonnage: 500 tph (Stacker) and 2,000 tph (Reclaimer)
Belt Strength:  EP-500 N/mm
Belt Speed:  2.83 m/s (Stacker) and 2.75 m/s (Reclaimer)
Material Conveyed: Potash

 

Aqaba Project was last modified: May 4th, 2016 by CDI